12 Questions to Ask Before You Sign an Engineering Capacity Contract
Most engineering capacity contracts get signed after two calls and a rate discussion. Then, somewhere around month four, somebody discovers that the person who has been building your payments integration is a subcontractor of a subcontractor, that the notice period is ninety days, or that nobody has established who owns the code.
None of that is exotic. It is what happens when the commercial conversation runs ahead of the diligence one, which it almost always does, because rates are easy to compare and everything else takes effort.
What follows is the question set I would want a buyer to bring to me. Twelve questions, grouped by what they protect, each with the answer that should reassure you and the answer that should end the conversation.
Two of them are ones we would rather you did not ask, and they are in here anyway. A supplier who only equips you with questions they answer well is not helping you buy: they are helping you buy from them.
People: who exactly am I getting?
1. Who performs the vetting, and what does it actually test?
Reassuring: a described process with technical assessment, communication assessment and background verification, plus a rejection rate they can quote. Red flag: “all our engineers are senior” with no method behind it.
2. Am I meeting the people who will do the work?
Reassuring: yes, before signature, and the named individuals appear in the contract. Red flag: impressive profiles at proposal stage and different names at start date. Ask directly whether anyone presented could be substituted, and get the answer in writing.
3. Is anyone in the chain a subcontractor?
Reassuring: a clear answer either way, with the arrangement documented. Red flag: hesitation. Subcontracting is not inherently wrong, but undisclosed subcontracting breaks your data and vetting assurances at the same time. This matters more since April 2026, when joint and several liability rules began transferring unpaid PAYE and NIC in umbrella supply chains to agencies and then to end clients, with no safe harbour (ContractorUK, 2026).
4. What happens if someone is not working out, and how quickly?
Reassuring: a defined replacement window, in days, with no charge during the gap and a documented context handover. Red flag: “we’d work with you on that.” Given how much counteroffer and drop-out activity there is in senior hiring (Optima Europe, 2026), a credible replacement commitment is worth real money.
Commercials: what am I actually paying for?
5. What is in the rate, and what sits outside it?
Reassuring: an itemised answer covering management time, holiday cover, equipment and tooling. Red flag: a single number with no breakdown. Ask specifically who pays for the engineer’s laptop and licences, because the answer reveals the operating model.
6. What is the minimum term and the notice period?
Reassuring: no minimum term and short notice, measured in weeks. Red flag: twelve-month minimums with ninety-day notice. Flexibility is the main thing you are buying; a contract that removes it has sold you the wrong product.
7. How and when can the rate change?
Reassuring: a defined review point, a cap, and advance notice. Red flag: silence. Nearshore rates rose 12–22% between 2024 and 2026 in some markets, so an uncapped review clause is a real exposure over a two-year relationship.
8. What happens to the rate if I scale up or down?
Reassuring: volume terms stated openly, and a clear position on reducing headcount mid-term. Red flag: discounts offered for scale with no corresponding mechanism for shrinking.
Delivery: who owns what, and how do I know it is working?
9. Who owns the intellectual property, and from what moment?
Reassuring: you do, on creation, assigned in the contract, with the position flowing through to any subcontractor or individual. Red flag: assignment on final payment, or ownership addressed only in the master agreement without flowing down the chain.
10. Where does the code live, and where does the data sit?
Reassuring: your repositories, your cloud, your access control, with a clear statement of physical data location. Red flag: development on supplier infrastructure with a promise to hand it over later. If you are in a regulated sector, settle this before anything else: it rules partners out faster than any other question.
11. How is progress evidenced, and what happens to context when someone leaves?
Reassuring: work in your issue tracker, commits in your repositories, decisions written down in a place you own. Red flag: a weekly status report as the primary artefact. The test question is what remains if the engineer stops tomorrow, and the answer should be “everything except the person.”
Risk: what happens when something goes wrong?
12. What are the insurance, right-to-work and exit provisions?
Reassuring: professional indemnity at a stated level, a described right-to-work and employment status position for every jurisdiction involved, and a written exit plan covering handover, access revocation and data return. Red flag: insurance mentioned but not quantified, and an exit plan that does not exist because nobody has ever asked.
On employment status specifically: be sceptical of any supplier who presents a statement of work as an IR35 solution. HMRC assesses working practices and commercial reality rather than the document, and can look through arrangements that are really resource supply (Qdos; IR35 Update, May 2026). A supplier who claims otherwise is transferring their risk to you while telling you the opposite.
Final Thoughts
None of these questions are unreasonable, and none of them take long to answer if the supplier has thought about them. That is the actual test. You are not looking for perfect answers: you are looking for evidence that someone has been through this before and has a position rather than a reflex.
Expect some honest limits. A good partner will say “we don’t do that” about something, and that is more reassuring than twelve enthusiastic yeses. Suppliers who agree to everything in the sales process tend to renegotiate in delivery.
Three of the twelve matter more than the rest, and they are the ones most often skipped: who exactly you are getting and whether they can be substituted, where the code and data physically sit, and what the exit looks like. Get those wrong and the others rarely save you.
Given that as recently as 2024 only around one in ten businesses were assessing their suppliers’ security posture properly (UK NCSC), working through a list like this puts you well ahead of the field.
Bring these twelve questions to a discovery call with us and ask them. We will answer all of them, including where our answer is a no.
Ready to scale your tech team? Get in touch with Thoughtgears. We’d love to hear about your project.
FAQs
What is the single most important question to ask?
Whether the people presented at proposal stage are the people who will actually do the work, and whether anyone can be substituted. Get the answer in writing. Presentation-and-substitution is the most common source of disappointment in this category.
Is subcontracting a dealbreaker?
Not inherently, but undisclosed subcontracting is. It breaks your vetting assurances and your data assurances at once, and since April 2026 joint and several liability rules can push unpaid PAYE and NIC up the chain to the end client (ContractorUK, 2026).
What replacement guarantee is reasonable?
A defined window measured in days rather than a vague commitment, no charge during the gap, and a documented context handover. The handover matters as much as the speed: a fast replacement with no context restarts your ramp.
Should there be a minimum term?
Ideally not. Flexibility is real when there is no minimum term and notice is short, measured in weeks. Twelve-month minimums with ninety-day notice remove the main benefit you are buying. If a supplier needs a long lock-in to make the economics work, that is worth understanding before you sign.
Who should own the IP?
You, on creation, assigned in the contract, with the position flowing down to individuals and any subcontractors. Assignment on final payment creates an obvious problem in any dispute, and ownership stated only at master agreement level may not reach the person writing the code.
Should development happen on our infrastructure or theirs?
Yours, in almost every case. Your repositories, your cloud, your access control. Development on supplier infrastructure with a promised handover creates a dependency that is difficult to unwind and, in regulated sectors, difficult to justify.
How do we evidence progress without micromanaging?
Work in your issue tracker and commits in your repositories, with decisions recorded somewhere you own. If the primary artefact of the relationship is a weekly status report, you have visibility of a narrative rather than of the work.
Does a statement of work put contractors outside IR35?
No. HMRC assesses working practices and commercial reality rather than the contract label, and can look through arrangements that are genuinely resource supply (Qdos). A well-structured SoW can support an outside position where the substance matches; it does not create one.
What should the exit plan cover?
Handover of code, documentation and context; access revocation on a defined timeline; return or deletion of any data; and who does what in each case. Write it before you need it, because the day you need it is the day nobody is motivated to draft it.
How many suppliers should we run this process with?
Two or three is usually enough. The question set is designed to separate suppliers who have done this before from suppliers who have not, and that distinction tends to be clear by question four.